Excavation Permits

The following must be supplied before an excavation permit will be issued.
  • Provide a Certificate of Insurance as proof of the required coverage and the Pueblo West Metro District shall be named as an additional insured on the policy.
  • Adequate coverage is: liability arising out of bodily injury to persons or damage to property with minimum limits of Five Hundred Thousand Dollars ($500,000)

Traffic Control


  • All construction activity that takes place in the District right-of-way must follow the Manual on Uniform Traffic Control Devices for temporary traffic control in the roadway.
  • Excavation Permits are required for any excavation within the right-of-way by Resolution 1437.

Right of Way Excavation Permit


A Right-of Way Excavation Permit (PDF) is required when working within the Pueblo West Metropolitan District Right-of-Way, including but not limited to:
  • Landscaping
  • Storm drainage
  • Utility installations
  • Other excavation or installation in the right-of-way

Applying for a Permit


A completed permit can be returned to the Administrative Office. Before the District shall issue a permit to any excavator, a Certificate of Insurance as proof of the required coverage and the Pueblo West Metropolitan District named as an additional insured on the policy is required. Adequate coverage is bodily injury and property damage liability insurance with minimum limit of $500,000 combined single limit coverage.